VERT COMPLEX (MKS). Scope of work, Installation of 3 ton hot water boiler , Expansion tank, pumps, ducting , routing of cable trays ,pipe work from boiler to the drier and testing / commissioning.

FEASTFOOD PROCESSORS LTD (DIANI MOMBASA): Scope of works , Installation of 3 ton steam boiler ,all the steam pipe work to the equipment’s , Installation of water cooling tower ,air compressor machine and chilled plant as well, all pipe work , testing ,commissioning and later cladding / lagging work.

ZIARA DAIRIES LTD. (NAIROBI) Scope of works, installation of 2 ton steam boiler, all steam generating lines and condensate, Installation of chilled plant, cooling tower and compressed air lines too, testing and commissioning and later cladding / lagging work.

LAND O LAKE (BIDCO NAKURU) Scope of work, Installation of 3 ton oil fired steam boiler, Fabrication of oil and water service tanks, all pipe work, steam tracing the oil tanks and pipe line then cladding / lagging work.

DAIMA DIARIES LTD (SAMEER NAKURU): Scope of work, Installation of steam and hot water boiler, cyclones, ducts all, pipe work then cladding / lagging works

MALAWI DIARIES LTD (LILONGWE): Scope of the work, Construction of natural cooled tower, 49,000 cubic letters chilled plant and coal fired combloc steam boiler and all steam and water pipe work.

PWANI OIL REFINERIES LTD: scope of work, Installation of fuel fired high pressure steam boiler with erection of steam drum, deorerator and chimney; all steam herder and pipe work and routing of a cable tray.

HIGHLAND CREAMERIES DIARY: Scope of work, Installation of two 6 ton steam boiler (wood fired and oil fired) , cyclones and all steam pipe work from boiler, main steam header via operational header to the equipment’s, ducting work and all cladding/lagging work.

BRARUDI BRAWERIES (BUJUMBURA BURUDI): Scope of the work, Installation of 3 ton fuel fired steam boiler, all generating steam pipe work to the equipment’s fabrication of the service water tanks and ducts and erecting of the chimney.

ACACIA FOOD AND BEVERAGES LTD (LUSAKA ZAMBIA): Scope of work , Installation of water cooling tower and chiller plant , pipe work then testing and lagging the chilled water generating lines.

AZAM FOOD AND BEVERAGES LTD (DA-ARESALAM TZ): Scope of work, Installation of 2nos 6 ton steam boiler, fabrication of tank structure and water and oil tanks, chimney and ducting too, all pipe work from boiler to the operational header then equipment’s, testing and commissioning work.

KISII BOTTLERS LTD: Scope or work, Installation of 6 ton Steam boiler, conveyor assembling to convey the fuel coal unto the firing furnace and all steam and water service pipe work and ducting. After testing and commissioning cladding/lagging followed. All plant are in good working condition as it is regularly inspected and services personnel proposed for maintenances and contracts are our extensive staff of foreman, specialized staff workers.  Our specialized staff includes mechanical technician/fitters, plumber, pipe fitter, arc/ gas and x-ray welding and mason. Our personnel are highly trained, experienced staff.  High quality workmanship is an essential part of services rendered.
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
  • Attributes
  • Custom attributes
  • Custom fields
Click outside to hide the compare bar
Compare
Compare ×
Let's Compare! Continue shopping